Supermicro SuperServer 5019S-ML — Mechanical Loading

SuperServer 5019S-ML User's Manual Chapter 2: Server Installation Chapter 2 In single rack installations, stabilizers should be attached to the rack. In multiple rack in­ stallations, the racks should be coupled together. Server Installation Always make sure the rack is stable before extending a server or other component from the rack. You should extend only one server or component at a time - extending two or more simul­ taneously may cause the rack to become unstable. 2.1 Overview This chapter provides advice and instructions for mounting your system in a server rack.

If your system is not already fully integrated with processors, system memory etc., refer to Chapter 4 for details on installing those specific components. Server Precautions Review the electrical and general safety precautions in Appendix B. Caution: Electrostatic Discharge (ESD) can damage electronic components. To prevent such damage to PCBs (printed circuit boards), it is important to use a grounded wrist strap, handle all PCBs by their edges and keep them in anti-static bags when not in use. Determine the placement of each component in the rack before you install the rails. Install the heaviest server components at the bottom of the rack first and then work your way up.

2.2 Preparing for Setup Use a regulating uninterruptible power supply (UPS) to protect the server from power surges and voltage spikes and to keep your system operating in case of a power failure. The box in which the system was shipped should include the rackmount hardware needed to install it into the rack. Please read this section in its entirety before you begin the installation. Allow any drives and power supply modules to cool before touching them. When not servicing, always keep the front door of the rack and all covers/panels on the servers closed to maintain proper cooling. Choosing a Setup Location The system should be situated in a clean, dust-free area that is well ventilated.

Avoid areas where heat, electrical noise and electromagnetic fields are generated. Rack Mounting Considerations Leave enough clearance in front of the rack so that you can open the front door completely (~25 inches) and approximately 30 inches of clearance in the back of the rack to allow sufficient space for airflow and access when servicing. Ambient Operating Temperature If installed in a closed or multi-unit rack assembly, the ambient operating temperature of the rack environment may be greater than the room's ambient temperature.

Therefore, consideration should be given to installing the equipment in an environment compatible with the manufacturer’s maximum rated ambient temperature (Tmra). This product should be installed only in a Restricted Access Location (dedicated equipment rooms, service closets, etc.). This product is not suitable for use with visual display workplace devices acccording to §2 of the the German Ordinance for Work with Visual Display Units. Airflow Equipment should be mounted into a rack so that the amount of airflow required for safe operation is not compromised.

Rack Precautions Ensure that the leveling jacks on the bottom of the rack are extended to the floor so that the full weight of the rack rests on them. Mechanical Loading Equipment should be mounted into a rack so that a hazardous condition does not arise due to uneven mechanical loading. 18 17