Chapter 2: Server Installation Outer Rack Rails Outer rails attach to the rack and hold the chassis in place. The outer rails for the SC826BE1C chassis extend between 30 inches and 33 inches. Installing the Outer Rails to the Rack 1. Secure the back end of the outer rail to the rack, using the screws provided. 2. Press the button where the two outer rails are joined to retract the smaller outer rail. 3. Hang the hooks of the rails onto the rack holes and if desired, use screws to secure the front of the outer rail onto the rack. 4. Repeat steps 1-3 for the remaining outer rail. 3 1 2 Figure 2-2. Assembling the Outer Rails Note: Figure is for illustrative purposes only.
Always install servers to the bottom of a rack first. Note: Both front chassis rails and the rack rails have a locking tab, which serves two functions. First, it locks the server into place when installed and pushed fully into the rack (its normal operating position. In addition, these tabs lock the server in place when fully extended from the rack. This prevents the server from coming completely out of the rack when pulled out for servicing. Warning: Stability hazard. The rack stabilizing mechanism must be in place, or the rack must be bolted to the floor before you slide the unit out for servicing. Failure to stabilize the rack can cause the rack to tip over. 21