Department of Defense MIL-STD-1311C — MIL-STD-1311C Test Methods for Electron Tubes – DoD Standard PDF

Downloaded from https://www.everyspec.com MIL-STD-1311C 31 January 2001 METHOD 3347A IONIZATION (Cold cathode discharge types) Ionization voltage. When a holding period is specified for the test specified in 1 or 2 below, each test shall be immediately preceded by its own holding period. A test shall not be repeated until this holding period has again elapsed. 1. Ionization voltage (1) (with illumination). Under the conditions specified on the TSS, the voltage required to start conduction shall be within the limit(s) specified. Unless some specific value of illumination is given, the tube shall be subjected to normal room illumination, either natural or artificial.

When a conditioning current is specified, this current shall be conducted between the elements to be tested not more than 30 seconds prior to making this test. This conditioning current shall be conducted for a period of not less than 0.1 second nor greater than 5 seconds. 2. Ionization voltage (2) (total darkness). The tube shall be held inoperative in total darkness for a holding period of not less than 24 hours prior to performance of the test and until completion of the test. The cover used to obtain a state of total darkness shall be fabricated from an opaque, non-metallic material.

Under the conditions specified on the TSS, the voltage required to start conduction in total darkness shall be within the limit(s) specified. METHOD 3347A 25 March 1970 3347-1