Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 2.6.2.1.3 VEMP Description. The GENERIC MISSILE will only be subjected to the Early-Time Waveform of the VEMP environment produced by an exo-atmospheric nuclear detonation. The VEMP environment has two additional waveform components, E2 for Intermediate-Time and E3 for Late-Time. These two waveforms will not be considered for the GENERIC MISSILE because they are applicable for systems connected by very long cables (E2) or to systems connected to the power grid or communications lines (E3).
The E2 and E3 HEMP waveforms will contribute some energy coupling to the GENERIC MISSILE; but, the amount of energy coupled by these two waveforms to this discrete system will be insignificant relative to E1. Also, energy coupled by these two waveforms will not be additive since they will be out of time phase with each other as well as with E1. 2.6.2.1.4 LCN&ES. IAW AR 70-75, MIL-STDs 2169B and 464A, a life-cycle program shall be established and implemented for mission critical systems such as the GENERIC MISSILE. In addition, the GENERIC MISSILE’s operational performance requirements shall be met throughout its rated life cycle.
The production, operation, maturity, maintenance, storage, upgrades, enhancements, ambient environment, and DMS solutions and technology insertions, shall not introduce any VEMP susceptibilities or unacceptable levels of degradation into the GENERIC MISSILE. 2.6.2.2 Data Analysis / Procedure. 2.6.2.2.1 Data. The pre-test analysis will consist of evaluating results from the previous GENERIC MISSILE VEMP program and reviewing the test system’s configuration. Pertinent data, results and information will be incorporated into the test planning of the SVAD VEMP program for the GENERIC MISSILE. The incorporation of all test data will be used to enhance and reduce the scope of testing.
Pertinent data will be included in the SVAD failure diagnostics, post-test analysis/assessment, and documented in the detailed test report to support the test results. 2.6.2.2.2 Criteria Compliance. The VEMP environmental data from the VEMP facility will be corrected to account for the percent error associated with the DAS: a. A mean and standard deviation will be established from the error corrected VEMP E-Field parameters. b. The H-Field parameter will be derived by dividing this mean error corrected VEMP E-Field parameter by 377 ohms. c. A mean and standard deviation rise time will be established from the VEMP E-Field data. B-2