US Army Developmental Test Command TOP 1-2-622 — REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 2.6.3.1.5 System Setup. a. Prior to testing, the GENERIC MISSILE SUT will be functionally checked to ensure proper operation. Problems will be documented, reported, and corrected if detrimental to the VEMP survivability assessment program on the GENERIC MISSILE. b. The GENERIC MISSILE SUT in a pre-test analysis selected configuration will be positioned in the VEMP facility near the center of the test volume for the desired test level (defined by the peak E-Field). The GENERIC MISSILE SUT will then be powered and a functional check performed. c.

A bulk current probe will be placed near (but not attached to) the longest cable length in the SUT and an EM noise measurement taken to establish the data collection base. This type of base-line measurement will be made for all of the current probes. d. Bulk current measurements will be obtained on cables identified in the pre-test analysis as being potential paths for harmful levels of VEMP induced energy. Pin current measurements will only be collected if a failure is identified. The pin current data will be utilized in a failure analysis and/or to perform corrective actions. 2.6.3.1.6 System Test.

The GENERIC MISSILE SUT will be illuminated by a transverse electromagnetic wave whose E-Field magnitude is approximately 75% of the E1 VEMP criterion value. After illumination, the GENERIC MISSILE will again be checked to establish the functional status of the system. At the completion of each successful test series (all cables measured), the GENERIC MISSILE SUT will be changed to account for energy coupling into different cable layouts and functions in the system. Once the series of four orientation-positions and modes described in Para 2.6.3.1.d have been completed, then the E-Field magnitude will be increased to the next E-Field level and the test procedures repeated.

These procedures will be repeated for the third E-Field test level. 2.6.3.1.7 Effects Procedure. If an effect/anomaly occurs, it will be documented and diagnosed. Testing will not continue until the problem is understood, and its effect on the GENERIC MISSILE SUT has been assessed as well as potential impacts on the GENERIC MISSILE SUT results if testing is continued. If an upset occurs, the GENERIC MISSILE power will be cycled OFF/ON. If the SUT fully recovers, testing will be repeated at the same level and test orientation to determine whether the problem was EME induced or an anomaly.

Borderline cases may require an additional test exposure or Current Injection (CI) testing to explicitly establish whether the effect was environmentally induced. If the SUT does not recover, then follow-up checks, measurement review, and review of the pre-test analysis will be used to identify the energy path and the affected electronic piece-part/component. If the effect is a failure, diagnostic checks will be performed to determine energy path and victim(s). If the operational status of the SUT can be restored, an engineering judgment will be made of potential risk to the SUT if testing is continued. Every effort will be made to complete testing. B-6