US Army Developmental Test Command TOP 1-2-622 — Test Setup #1

Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 APPENDIX C: DATA DOCUMENTATION. TESTING DOCUMENTATION EXAMPLE. TEST CONDUCTOR: XXXXXXX DATE: 20 May 09 FACILITY: VEMP Facility PAGE_1__ OF _10_ General Comments: E-Field = Electric Field C-1 Shot # and Utilized Test Level Test Orientation Test Mode Pretest and Post-test Test Points and Item # Equipment kV/m Results Comments Serial #s 1 # 5723 GENERIC MISSILE S/N# 26264 Test Setup #1 1st Tank Parallel to E- Field Distance = 15 Meters GCVP of Tank Powered and Operational Hull = Turret - 0° pre - OK post – OK 11 8-Input Multiple Links.

– See Test Point Information 2 #5724 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above 3 # 5725 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above 4 # 5726 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above 5 # 5727 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above 6 # 5728 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above 7 # 5729 Same as 1 Above 1st Same as 1 Above Same as 1 Above pre - OK post – OK Same as 1 Above