US Army Developmental Test Command TOP 1-2-622 — REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com TOP 1-2-622 11 September 2009 (h) Identify test system's configuration. (i) Analyze grounding scheme and shielded cables to include backshells and connectors to insure that the system is designed and manufactured with electromagnetic shielding. (j) Analyze contractor's program documentation and operating modes. (k) Analyze hardening and analysis performed by contractor. (l) If required, fabricate Breakout Boxes (BOBs) for all cables of concern to enable actual pin measurements to be performed during testing and current injection. (m) Test system's configuration with respect to each environmental exposure.

(n) Differences between test and production configuration. b. Second, the TO must thoroughly document and analyze the test hardware which is to be utilized during the VEMP STA. This documentation and determination includes the test system's material composition, shape, size, mass, fastening schemes, shielding and attenuation characteristics, EMP hardening concepts and devices and Mission Essential Functions (MEFs). With all this information, the TO can identify and establish the test system and proposed system baseline configuration.

This baseline will be utilized for the survivability analysis as well as a basis for analysis of all product improvements, Engineering Change Proposals (ECPs), and configuration changes to ensure that the test system remains VEMP survivable during production, maintenance, and deployment. c. Lastly, the TO must analyze and determine the test system's performance with a detailed post-test analysis. This post-test analysis includes test environments and results of the pretest analysis, documentation and detailed determination of the test system's performance, determination of all shortcomings and failures, and determination of obtained environmental data against the USANCA criteria.

In order to effectively determine criteria compliance, the TO must thoroughly understand the simulation fidelity of the test facility along with the test facility’s documentation and procedures to account for fidelity deficiencies. All test facilities have one or more parameter deficiencies. It is very important that these deficiencies be well understood and analysis performed to establish the effects of these parameter deficiencies on the results of the test. With this facility provided analysis, the TO can adequately determine the environmental test parameters against the desired USANCA criteria.

In order to effectively analyze survivability of the system configuration, the TO must thoroughly understand the differences between the system's test configuration and the system's production configuration, and corresponding effects on the system assessment. 8