US Army Developmental Test Command · TOP 1-2-501 · 13 pp.

US Army Developmental Test Command US Army TOP 1-2-501 Rail Impact Testing Manual (2008) PDF Download

Процедура проведения испытания железнодорожным ударом для проверки структурной целостности изделия и adequacy системы крепления (tie-down) при перевозке по железной дороге.

Related manuals

Contents

Document text

REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std. Z39-18 REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information.

Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for information on Operations and Reports (0704- 0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) 15-09-2008 2. REPORT TYPE Final 3.

DATES COVERED (From - To) 4. TITLE AND SUBTITLE Test Operations Procedure (TOP) 1-2-501 Rail Impact Testing 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHORS 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Support Equipment Division (TEDT-AT-WFE) US Army Aberdeen Test Center 400 Colleran Road Aberdeen Proving Ground, MD 21005-5059 8. PERFORMING ORGANIZATION REPORT NUMBER TOP 1-2-501 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) Test Business Management Division (TEDT-TMB) US Army Developmental Test Command 314 Longs Corner Road Aberdeen Proving Ground, MD 21005-5055 10.

SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) Same as item 8 12. DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited. 13. SUPPLEMENTARY NOTES Defense Technical Information Center (DTIC), AD No.: ADA490124 This TOP supersedes TOP 1-2-501,dated 30 June 1995 14. ABSTRACT This TOP describes the procedures for conducting a rail impact test. 15. SUBJECT TERMS Rail impact Tie-downs Buffer Car Couplers Transportability 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT SAR 18. NUMBER OF PAGES 11 19a. NAME OF RESPONSIBLE PERSON a. REPORT Unclassified B. ABSTRACT Unclassified C. THIS PAGE Unclassified 19b.

TELEPHONE NUMBER (include area code)

Page 1

REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com

Page 2

REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com US ARMY DEVELOPMENTAL TEST COMMAND TEST OPERATIONS PROCEDURE * Test Operations Procedure TOP 1-2-501 15 September 2008 DTIC AD No.: ADA490124 RAIL IMPACT TESTING Page Paragraph 1. SCOPE ............................................................................................ 2 2. FACILITIES AND INSTRUMENTATION .................................. 2 2.1 Facilities .......................................................................................... 2 2.2 Instrumentation ............................................................................... 3 3. REQUIRED TEST CONDITIONS ................................................

3 3.1 Test Planning .................................................................................. 3 3.2 Test Preparation .............................................................................. 4 4. TEST PROCEDURES .................................................................... 5 4.1 Rail Impact Test .............................................................................. 5 4.2 Temperature Conditioning .............................................................. 6 4.3 Failure Definition ............................................................................ 7 5. DATA REQUIRED ........................................................................ 8 6.

DATA PRESENTATION ............................................................... 8 Appendix A. REFERENCES ............................................................................... A-1 *This TOP supersedes TOP 1-2-501, dated 30 June 1995 Approved for public release; distribution unlimited.

Page 3

REPORT DOCUMENTATION PAGE

Downloaded from https://www.everyspec.com TOP 1-2-501 15 September 2008 1. SCOPE. a. This TOP describes the procedure for conducting a rail impact test. The rail impact test is used to verify structural integrity of the test item and the adequacy of the tie-down system and tie-down procedures. This TOP is intended for vehicles and equipment that will be transported by rail; to determine the effect of normal railroad car impacts that occur during rail shipment over the full life span of the test item. b. This TOP is not intended for separate testing of small individually-packaged pieces of equipment that would normally be shipped and tested when mounted on a pallet.

It does not cover vibration induced by railcar movement. 2. FACILITIES AND INSTRUMENTATION. 2.1 Facilities.

Item Requirement Straight dry level section of railroad track 61 m (200 ft) minimum length, with additional track in order to reverse the test railcar/buffer car(s) for impacting in the opposite direction To provide distance to accelerate locomotive and the test item railcar to specified impact speeds Locomotive, Inclined Ramp, Tug Car, or other Mechanical Drive To accelerate the railcar with the test item to the required pre-impact velocity Test railcar equipped with end-of-car cushioned draft gear and a conventional underframe (without cushioning) and chain tie-downs To transport the test item into the buffer car(s) Buffer car(s) (1 to 5) with total weight of 113,400 kg (250,000 lb), with the first buffer car equipped with standard (friction) draft gear and remaining buffer cars (if any) equipped with either standard draft gear or cushioned draft gear, with the draft gear compressed for either case.

To act as buffer car(s) into which the test item car is impacted Use of other railcar types for testing to be representative of the intended shipping methods Advanced approval of Director, SDDCTEA, Attn: SDTE-DPE, Building 1990, 709 Ward Drive, Scott AFB, IL 62225 Temperature conditioning chamber (if required) To provide the required temperature environment for the test item 2

Page 4