7. BEACON LAMP CIRCUIT 1) OPERATING FLOW Fuse box (No.17) I/conn CN-8(3) Beacon lamp switch CS-23(6) When lamp switch ON Beacon lamp switch ON CS-23(2) Switch lndicator lamp ON l/conn CN-8(4) l/conn CS-23(9) CN-10(10) Beacon lamp ON CL-7 2) CHECK POINT GND : Ground 4 -16 Engine Start switch Check point Voltage STOP ON - GND(Fuse box) - GND(Switch power input) - GND(Switch power output) - GND(Beacon lamp) 20~25V