Section 0 - Engine Disassembly and Assembly - Group 00 Engine Assembly (0-02) M11 Page 0-129 Electronic Control Cooling Plate - Installation Install the electronic control cooling plate and the two mounting brackets. Use two capscrews (M10-1.50 x 100) in the bottom mounting holes and two capscrews (M10- 1.50 x 60) in the upper mounting holes. Install the heat resistant grommets on both sides of the cooling plate. Install the two heat resistant star washer grommets at the same mounting location. Torque Value: 40 [30 ft-lb] Tighten the four capscrews. Electronic Control Module - Installation Caution: Do not paint the back side of the ECM.
Make sure there is no grease or dirt between the ECM and the cooling plate. Install the ECM to the electronic control cooler plate using six capscrews (M6-1.00 x 20). Torque Value: 7 [62 in-lb] Make sure the star washer is installed under one of the capscrews. NOTE: Be sure the pins for the wire harness connectors in the ECM are not bent or damaged. Caution: Do not blow compressed air onto the ECM ports or connectors. Compressed air can contain moisture due to condensation. Remove all dirt and moisture from the ECM connector ports and the harness connector by spraying each with electronic contact cleaner, Part No. 3824510. Allow the ports and connectors to dry. Caution:
Use only Cummins recommended lubricant DS- ES, Part No. 3822934. Other lubricants such as lubricat- ing oil or grease in the connectors can cause ECM dam- age, poor engine performance or premature connector pin wear. Apply a thin coating of lubricant to the connector nose piece.