TM2361 (24JUN08) 9025-15-5 450DLC Excavator Operation and Tests 062608 PN=755 Diagnostic Information 5 Main Relief Valve Check Key on, use monitor service menu to display Pump 1 and Pump 2 Delivery Pressure. See Monitor Service Menu Operation. (Group 9015-16.) NOTE: To test with remote gauge, Perform Main Relief and Power Digging Valve Test and Adjustment. (Group 9025-25.) Set power mode at HP. Run engine at fast idle and operate boom raise function. Observe pump 1 and 2 delivery pressure when boom raise is held over relief. Are both pumps delivery pressure in 30.4—32.9 MPa range? YES: Go to Cycle Time Check. NO: Adjust or replace main relief and power digging valve.
Perform Main Relief and Power Digging Valve Test and Adjustment. (Group 9025-25.) – – –1/1 6 Cycle Time Check Perform Cycle Times Check. (Group 9005-10.) Check travel cycle times. Are travel cycle times at specifications? YES: Diagnostic procedure complete. NO: Go to Restricted Hydraulic Oil Tank Suction Screen Check. – – –1/1 7 Restricted Hydraulic Oil Tank Suction Screen Check Inspect hydraulic oil tank suction screen. See Change Hydraulic Tank Oil, Clean Suction Screen. (Operator’s Manual.) Is hydraulic oil tank suction screen free of restriction? YES: Go to Hydraulic Pump Check. NO: Clean or replace hydraulic oil tank suction screen.
– – –1/1 8 Hydraulic Pump Check Perform Pump Flow Test. (Group 9025-25.) Check pump flow. Does pump flow meet specification? YES: Go to Wiring Connector Check. NO: Repair or replace pump. See Pump Remove and Install. (Group 3360.) – – –1/1 9025 15 5 9 Wiring Connector Check See Pilot Shutoff Switch Harness (W11) Component Location. (Group 9015-10.) Inspect hydraulic control wiring. NOTE: Most wiring problems should generate a DTC, check for DTC’s before tracing wiring. Are all the connectors in good condition? YES: Diagnostic procedure complete. NO: Repair or replace connectors. – – –1/1