Toyota — REMOVAL

gn 11. CONNECT WIRE HARNESS (a) Connect the transmission wire and install the 3 clamps to the transmission unit. (b) Connect the 3 connectors. 12. CONNECT FLOOR SHIFT TRANSMISSION CONTROL ROD (a) Connect the shift control rod and install the pin and clip. 13. CONNECT TRANSFER SHIFT LEVER (a) Connect the transfer shift lever rod assembly with the nut. Torque: 12 N·m {122 kgf·cm, 9ft·lbf} 14. INSTALL REAR PROPELLER SHAFT ASSEMBLY 15. INSTALL FRONT PROPELLER SHAFT ASSEMBLY 16. INSTALL FRONT EXHAUST PIPE (a) Install the front exhaust pipe RH and LH . 17. INSTALL TRANSFER SHIFT LEVER BOOT (a) Install the transfer shift lever boot with the 4 bolts. Torque:

5.4 N·m {55 kgf·cm, 48in·lbf} (b) Install the upper console panel . (c) Install the transfer shift lever knob. 18. INSTALL DRIVE BELT, FAN AND FLUID COUPLING ASSEMBLY, FAN SHROUD AND RADIATOR RESERVOIR (a) Install the drive belt, fan and fluid coupling assembly, fan shroud and radiator reservoir . 19. INSTALL AIR CLEANER CAP SUB-ASSEMBLY 20. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 21. PERFORM INITIALIZATION (a) Perform initialization . NOTICE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal. 22. CHECK FOR EXHAUST GAS LEAKS 23. INSPECT AUTOMATIC TRANSMISSION FLUID (a) Inspect automatic transmission fluid . 24.

INSTALL ENGINE UNDER COVER Torque: 28 N·m {286 kgf·cm, 21ft·lbf} (a) Install the No. 1 and No. 2 under covers. cardia