Atari · 800 · 96 pp.

Atari 800 Service Manual PDF — Repair & Troubleshooting Guide

Руководство по обслуживанию игрового автомата Indy 800: гарантия, установка и проверка новой машины, регулировка монетоприёмника, описание схем (Sync, Score, Coin Control, Car, Power PCB) и разделы тестирования и поиска неисправностей.

Related manuals

Contents

Document text

WARRANTY Seller warrants that its printed circuit boards and parts thereon are free from defects in material and workmanship under normal use and service for a period of ninety (90) days from date of shipment. Seller warrants that its television monitors are free from defects in material and workmanship under normal use and service for a period of thirty (30) days from date of shipment. None of the Seller's other products or parts thereof are warranted. lf the products described in this manual fail to conform to this warranty, Sellers’ sole liability shall be, at its option, to repair, replace, or credit Buyer's account for such products which Seller during said warranty period, provided:

are returned to (a) Seller is promptly notified in writing upon discovery by Buyer that said products are defective; (b) Such products are returned prepaid to Sellers’ plant; and (c) Seller’s examination of said products discloses to Seller's satisfaction that such alleged defects existed and were not caused by accident, misuse, neglect, alteration, improper repair, installation or improper testing. In no event shall Seller be liable for loss of profits, loss of use, incidental or consequential damages.

EXCEPT FOR ANY EXPRESS WARRANTY SET FORTH IN A WRITTEN CONTRACT BETWEEN SELLER AND BUYER WHICH CONTRACT SUPERSEDES THE TERMS OF THIS ORDER, THIS WARRANTY |S EXPRESSED IN LIEU OF ALL OTHER WARRANTIES EXPRESSED OR IMPLIED, INCLUDING THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, AND OF ALL OTHER OBLIGATIONS OR LIABILITIES ON THE SELLER’S PART, AND IT NEITHER ASSUMES NOR AUTHORIZES ANY OTHER PERSON TO ASSUME FOR THE SELLER ANY OTHER LIABILITIES IN CONNECTION WITH THE SALE OF PRODUCTS UNDER THIS ORDER. This document is and contains confidential trade secret information of Atari, Inc.

This document is loaned under confidential custody for the sole purpose of operation, maintenance or repair of Atari equipment and may not be used by or disclosed to any person for any other purpose whatever, and remains the property of Atari, Inc. Neither it nor the information it contains may be reproduced, used, or disclosed to persons not having a need to know consistent with the purpose of the loan, without written consent of Atari, Inc.

Page 2

Table of Contents Page Inside Warranty Section Section Section Section 1 General Maintenance Front Cover Information 1-1 Introduction 1-1 1-2 New Machine Set-up 1-3 New Machine Checkout 1-4 Coin Acceptor 1-5 General Machine 2 Circuit Description 2-1 General System 2-2 SYNC Printed Circuit Board 2-5 2-3 Score Printed Circuit Board 2-8 2-4 Coin Control Printed Circuit 2-5 Car Printed Circuit Board 2-6 Power Printed Circuit 2-7 Operator Adjustments 2-8 Service and Troubleshooting 3 Customer Service 3-1 Test 3-2 Required Minimum Equipment 3-3 Optional Equipment 3-4 Logic Types and Functions 4 Schematics, Drawings Supply Procedure 1-1 1-1 1-2 Maintenance 1-3 Description 2-1 Board 2-10 2-13 Board 2-19 € Instructions 2-19 2-21 Information Equipment and Parts Lists

Page 3

1. 1-1. GENERAL MAINTENANCE INFORMATION INTRODUCTION The Atari Indy 800 game consists circuit boards (PCBs), mounted circuit components. about the TV monitor interconnecting Except is presented a GE 25" color unit. standard TV troubleshooting quires of a cabinet, wiring, techniques. techniques to the PCBs and their associated exterior have occurred of the machine during shipment. Inspect interior for any obvious pulling broken 1-3. As cracked and to the cabinet or in- broken cabinet parts, assem- foreign objects or After both damage or disconnected connections. the wires, or machine has been plugged component and subassembly procedure.

CHECKOUT new machine is carefully for perform the checkout NEW MACHINE each have on, circuitry. for any damage blies in and turned in this manual it carefully Check electrical re- inspect components. shorting computer to the average information cabinet using on, ternal loose, PCB is PROCEDURE Before turning this machine may the that may be unfamiliar is dedicated which no information The TV monitor However, the troubleshooting SET-UP cabinet- various can be solved Therefore, NEW MACHINE and in this manual. technician. 1-2. printed for a schematic, TV circuit malfunctions troubleshooting TV monitor, leaves checked the factory, every for proper operation.

been damaged or adjustments checkout procedure must changed be repeated prior However, during to since parts may shipping, placing the the following machine on location: 1. Inspect both the exterior and interior of the machine for obvious shipping damage such as cracked or broken cabinet parts, subassemblies 2. broken Carefully joints, inspect slip-on etc. the interior connectors, of the machine to plug-in connectors and type see that all are solder firmly seated. Pay particular attention to the PCB edge connector and the fuses. Also connections to the TV moni- tor, 3. loose, the check interlock the switches, and all other coin switch, Molex-type the connectors.

Plug the machine in, and pull out the white actuator shafts of the interlock switches if the rear door is open. Inspect the cathode ray tube image for a steady and sharp picture that exhibits the proper levels of brightness and 1-1 contrast.

Page 4

4. Insert several coin should counter one that the old and new coins into the coin acceptor. No genuine be rejected, and each coin insertion should digit. Depress the coin rejector button to linkage is operating step make the coin sure smoothly. 5. Coin insertion should start the game. Check making sure that all aspects of the game are for proper game sequence, functioning correctly. 6. The interlock machine door is opened. 1-4. Q-530 switch COIN must ACCEPTOR: coin acceptors leave If, however, critical been completely is it still mounted position 1. in If the place coin a vertical on the a. acceptor Set the test position. the e. f.

service, acceptor with has on the been a level place the or following removed the If the coin in a vertical door the back of the unit facing (2) and the separator Tighten the screws. and new) as they will several test returned go. coins by (both old striking the move and the (4) and as far to note that separator. screw amount to the Tighten the screw. Insert the test coins again and, if some of them are returned, repeat Step d until Loosen kicker screw as it will a slight still coins are accepted. and move the locker as far go. Tighten the screw. coins and test h. Loosen the kicker screw Tighten note that and move some the screw.

and, if all the coins are screws are tight after the coins again repeat Step h until Be that both made. 1-2 some are kicker the Insert been separator the the have the all Insert to the right. in the separator separator left. and you the sure procedure acceptor Loosen the has machine, surface. kicker are unit adjustment from and move both the Insert rear performance. if the (1) g. j- for desired, the kicker left 1. are for maximum holding some d. adjustments the §& MAINTENANCE screws the right ec. ADJUSTMENT when surface. Separator Loosen entire adjusted coin door, on a level the factory position Kicker and b. the disassembled suggested. off OPERATION, All more turn are to the returned.

a slight still amount returned, accepted. the adjustments (3) is

Page 5