Perkins · 86 стр.

Perkins Sabre Marine Engines Installation Manual (EN)

Оригинальное название: Perkins Sabre Marine Engines Installation Manual

Читать онлайн

Похожие инструкции

Текст документа

TPD1317e Contents Perkins Sabre Marine Engines Installation Manual M300Ti 6 Cylinder turbocharged, intercooled, diesel engine for pleasure boat applications M265Ti 6 Cylinder turbocharged, intercooled, diesel engine for pleasure boat applications M225Ti 6 Cylinder turbocharged, intercooled, diesel engine for pleasure boat applications M215C 6 Cylinder turbocharged, intercooled, diesel engine for commercial applications M185C 6 Cylinder turbocharged, intercooled, diesel engine for commercial applications M135 6 Cylinder naturally aspirated, diesel engine for pleasure boat applications M130C 6 Cylinder naturally aspirated, diesel engine for commercial applications M115T 4 Cylinder turbocharged diesel engine for all applications M92 4 Cylinder naturally aspirated diesel engine for all applications M92B 4 Cylinder naturally aspirated diesel engine for all applications Publication TPD 1317e, Issue 10 Published in May 2007 by Sabre Engines Ltd , Wimborne, Dorset, England.

BH21 7PW Tel: +44(0)1202 893720 Fax: +44(0)1202 851700 Email: post @sabre-engines.co.uk Website: www.Perkins-Sabre.com

Стр. 1

Contents TPD1317e This page is intentionally blank.

Стр. 2

TPD1317e Contents Location of Engine Installation Points............................................1 1 Engine Mounting............................................................................3 1.1 Installation Angles.....................................................................................3 1.2 Engine Mounting Brackets........................................................................4 1.3 Flexible Engine Mounts...........................................................................5 1.4 Engine Bearers.........................................................................................6 2 Propeller Shafts and Couplings....................................................7 2.1 Propeller Shafts........................................................................................7 2.2 Gearbox Output Couplings......................................................................8 3 Exhaust Systems..........................................................................11 3.1 Wet Systems............................................................................................

11 3.2 Dry Systems.............................................................................................13 3.3 Part Dry, Part Wet Systems.....................................................................20 3.4 Water Lift Systems..................................................................................20 4 Engine Room Ventilation..............................................................23 5 Engine Cooling Systems..............................................................25 5.1 Raw Water Systems.................................................................................25 5.2 Keel Cooling Statement:

M300Ti and M265Ti Engines - keel cooling is not offered with these models......................................27 5.3 Keel Cooling System: M225Ti, M215C and M185C Engines................27 5.4 Keel Cooling System: M135 and M130C Engine...................................28 5.5 Keel Cooling System:

M115T M92 and M92B engine...........................29 6 Fuel Systems.................................................................................33 6.1 Fuel Connections....................................................................................33 7 Engine Electrical Systems...........................................................37 7.1 Engine Wiring Looms..............................................................................37 7.2 Fuseboard................................................................................................43 7.3 Circuit Protection.

M92B only.................................................................44 Inverter/Converter Fitting Instructions.............................................. 44 7.4 Interconnecting Cable.............................................................................45 7.5 Instrument Panels...................................................................................47 7.6 Battery and Starter Cables.....................................................................51 7.7 Zinc Anode bonding system...................................................................52

Стр. 3

Contents TPD1317e 8 Engine Controls............................................................................55 8.1 M300Ti, and M265Ti Engines...................................................................55 8.2 M225Ti, M215C and M185C Engines......................................................56 8.3 M135 and M130C Engines.......................................................................57 8.4 M115T and M92 Engines.........................................................................58 8.5 M92B Engines.........................................................................................59 9 Provision for Power Take-off.......................................................61 10 Calorifier and Block Heater Connections.................................63 10.1 Calorifier...................................................................................................63 10.2 Block Heater - for 6 cylinder engine models.........................................65 11 Reference Data............................................................................67 11.1 M300Ti and M265Ti Engines...............................................................67 11.2 M225Ti, M215C and M185C Engines...................................................70 11.3 M135, and M130C Engines..................................................................73 11.4 M115T, and M92 Engines.....................................................................76 11.5 M92B Engines.......................................................................................79

Стр. 4