2009 — Installation

HOME sm01064 For engine rebuild procedure, proceed to 3.8 CAMSHAFTS, DRIVE CHAINS AND CAMSHAFT TIMING, Primary Cam Drive Installation to continue engine rebuild. NOTE 4. See a. b. c. d. 5. See 6. Figure 3-89. Lubricate Head Bolts Figure 3-90. Tighten four main head bolts in ence. See Figure 3-91.Tighten bolts to 35 Nm (25.8 ft-lbs). Loosen each bolt one full turn (360 degrees). Tighten bolts to 20 Nm (14.8 ft-lbs). Position the TORQUE ANGLE GAUGE (Part No. SNAP-ON TA360) per instruction sheet and tighten bolt an additional 90 degrees. NOTE tion for this torque sequence is written: 35 Nm - 360°, 90°. Figure 3-92. Install 5 mm head bolts. The two long are installed in positions 6 and 7.

The short bolt is lled in position 5. ten 5 mm head bolts to 9.7 Nm (86 in-lbs). sm01066 20 Nm (14.8 ft-lbs Figure 3-91.Tighten Head Bolts sm01065 5 1 4 6 sm01067 3 2 7 Figure 3-92. 5 mm Head Fasteners Figure 3-90. Head Bolt Torque Sequence (rear cylinder head) 2009 VRSC Service: Engine 3-45 Figure 3-92. 5 mm Hea t Torque Sequence (rear cylinder head) 2009 VRS d Fasteners C Service: Engine 3-45 Figure 3-90. Head Bol