2009 — Installation

HOME 7. Thread in housing fasteners and tighten to 9.7 Nm (86 in- lbs ). 17. Continue to run engine, check level, and add antifreeze until coolant level remains at COLD FULL line with the motorcycle on the jiffy stand. 8. With lower hose clamp in correct orientation, tighten clamp to 3-4 Nm (27-35 in-lbs ). 9. Install pipe clamp and p-clamp. Tighten fasteners to 6-10 Nm (53-88 ft-lbs). sm00620 2 1 10. Install air filter bottom, velocity stacks, o-rings and breather hose. See 1.5 AIR CLEANER AND EXHAUST SYSTEM . 11. Loosen air bleed plug. Remove pressure cap and fill with GENUINE HARLEY-DAVIDSON EXTENDED LIFE ANTIFREEZE & COOLANT through filler neck. 12.

Tighten air bleed plug to 9-11 Nm (80-97 in-lbs ) and reinstall pressure cap. 13. Reinstall air filter, air filter top and airbox cover. 14. Reinstall maxi-fuse and side cover. 3 4 15. Rinse the motorcycle with water to remove any spilled coolant. 1. To remove - counterclockwise 2. To install - clockwise 3. Thermostat Removal Tool (HD-45307) 4. Tab 16. After running engine, check coolant level in overflow bottle with coolant cold and motorcycle on jiffy stand. If level is below COLD FULL line, remove cap from overflow bottle and add antifreeze until fluid level reaches COLD FULL line. Figure 5-11.Thermostat Removal Tool 5-10 2009 VRSC Service: Cooling System