TM 5-3805-280-10 Operating the Machine USING BUCKET ARM DIGGING: For most general excavating, leveling material, and digging trenches. To begin excavating, position arm in vertical position and then move it away from machine approximately 0.61 m (2 ft). Using mainly the arm cylinder (A), retract the arm. As the bucket fills, curl the bucket while retracting the arm. The first cut should be approximately 1.2 m (4 ft) long and 75—100 mm (3—4 in.) deep. Remaining cuts should be approximately 1.2 m (4 ft) long and 100—150 mm (4-6 in.) deep. T7527CV –UN–10JUL91 Continued on next page TX,35,FF2325 –19–28JAN92–1/3 7-23