John Deere 230LCR, 230LCRD — CHAPTER 7

TM 5-3805-280-10 Operating the Machine To prevent cave-in’s: Work perpendicular to or at an angle to excavation, with propel motors to the rear of the machine. Do not drive near the edge of an excavation or trench. Do not dig under the machine. T7527CX –UN–10JUL91 TX,35,FF2325 –19–28JAN92–3/3 PLANNING SPOIL PILES To prevent cave-in’s, place spoil pile at least 1 m (3 ft) away from excavation. The deeper the excavation the further the spoil pile should be placed from the excavation. Place spoil piles for convenient truck loading or backfilling. T7527CY –UN–10JUL91 On slopes, place spoil piles on the upper side of the slope for improved machine stability and easier backfilling.

TX,35,FF2323 –19–13AUG91–1/1 TRENCHING Before starting work, walk the site to uncover hazards and to plan the job. Check for buried utility lines and pipes and for gas and oil pipelines. To prevent cave-in’s, dig a shaped trench and place spoil piles at least 1 m (3 ft) away from trench. The deeper the trench, the further the spoil pile should be placed from it. T7527CZ –UN–10JUL91 Continued on next page TX,35,FF2327 –19–13AUG91–1/4 7-25