John Deere 230LCR, 230LCRD — CHAPTER 7

TM 5-3805-280-10 Rod changer ADDING A ROD (AUTO MODE S1) Make sure : 9) Depress M4 button while keeping the lever in K2 direction to screw the rod into the bottom cou- pling. the carousel is properly positioned i.e. a rod housing is in front of the opening of the rod catcher (the indicator L is then alight). 10) Swing the rod changer lever in K3 direction. Hold the position for 1 second (the rod clamps open and the rod clamp arms swing into the carousel). # the rod clamp arms are swung into the rod changer. the rod clamps are closed onto a rod. the mode selector is on S1 position. 11) Open the hydraulic centralizer (switch E).

1) When drilling with the first rod is completed, close the centralizer onto the coupling (switch E). 12) Start air flushing (switch F) and drilling (drifter lever in C3 position). 2) Break loose the drifter shank (depress the thread loosening button H and pull back the drifter control lever in C2 direction to reverse the rotation). The rotation of the shank must be visible when looking at the connection, air flows from the connection. # The cycle will then end automatically : the car- ousel rotates to bring the following rod into the rod clamps, the rod clamps close onto the rod. Stop air flushing (switch F). 3) Unscrew the drifter shank from the coupling (lever in K4 position).

4) After the drifter shank has been discon- nected from the coupling, depress M3 button to lubri- cate the shank threads. 5) Raise the drifter to the top of the drill guide (feed lever in B4 direction). 6) Swing the next extension rod towards the drill guide (rod changer lever in K1 direction. Hold the position for 1 second.) 7) Depress M3 button to lubricate the rod threads. 8) Screw the drifter shank into the top coupling (rod changer lever in K2 direction). 7-47