Komatsu — eebm001902 a3.pdf

DISASSEMBLY AND ASSEMBLY TRACK ROLLER 8. Assemble collar (2) to shaft (5), and install pin (1). 9. Using tool M2 apply standard pressure to roller oil filler port, and check for leakage of air from seal. # Standard pressure: 0.1 MPa (1 kg/cm 2 ) # Method of checking The standard pressure shall be maintained for 10 seconds and the indicator of the gauge shall not go down. 10. Using tool M2 fill track roller assembly with oil, then tighten plug (11). Track roller oil: 250 - 280 cc (E030-CD) Plug: 14.7 ± 4.9 Nm (1.5 ± 0.5 kgm) 30-76