DISASSEMBLY AND ASSEMBLY CONTROL VALVE 8. Install LS select valve (38). LS select valve: 127.4 ± 19.6 Nm (13 ± 2 kgm) 9. Pressure compensation valves Check the marks made on each pressure compensation valve during disassembly, and install in the correct position. a. Before installing pressure compensation valves below, install check valves (35). b. Fit O-ring, then install arm IN (15), L.H. travel FORWARD (14), left swing (13), boom LOWER (12), R.H. travel FORWARD (11), and bucket CURL pressure compensation valve (10). c. Fit O-ring , then install arm OUT (3), L.H. travel REVERSE (4), right swing (5), boom RAISE (6), R.H. travel REVERSE (7), and bucket DUMP pressure compensation valve (8).

Pressure compensation valve: 392 ± 19.6 Nm (40 ± 2 kgm) 10. Install arm regeneration valve (77) and spring (76), then install plate (75). # Tighten the mounting bolts in the order shown in the diagram on the right. Mounting bolt: 66.15 ± 7.35 Nm (6.75 ± 0.75 kgm) 11. Unload valves, safety-suction valves, suction valves a. Fit O-rings and install suction valves (19), (26), (21), (24) and (25). Suction valve: 147 ± 9.8 Nm (15 ± 1 kgm) b. Fit O-rings and install safety-suction valves (18), (27), (22) and (23). Safety-suction valve: 147 ± 9.8 Nm (15 ± 1 kgm) c. Fit O-rings and install unload valves (17) and (1). Unload valve assembly: 166.6 ± 9.8 Nm (17 ± 2 kgm) 12.

Fit O-ring and install main relief valve assembly (2). Main relief valve: 53.9 ± 4.9 Nm (5.5 ± 0.5 kgm) 30-97