Komatsu — E-2: CONNECTION OF BOOM AND ARM

E-2:CONNECTlON OF BOOM AND ARM Remove the stopper fitted to the boom, then re- Set the arm cylinder fully extended. move the boom-arm connecting pin. & Boom-arm connecting pin: 81 kg * Use a forcing screw (Dia. = 16 mm, Pitch = 2.0 mm) to remove the pin. boom hole, then push in the pin on the right side of Raise the arm assembly with a crane, align with the the machine. Next, insert shims (z 21N-72-11210 tl.0, z 21N-72-11220 t1.5) in the clearance be- tween the boom and arm boss on the left side of the then push in the pin. machine to adjust the clearance to less than 1 .O mm, + Lke Arm assembly:

4500 kg * There are seals (209-72-I 1311 x 4) assembled inside the bushing on the arm side, so be careful not to damage them when pushing in the pin. * When connecting, be careful not to damage the grease piping of the arm boss. & Inside of bushing: Anti-friction compound (LM-P) 3. Install the stopper. For safety, fit a wire Be careful not to damage I i Section B - B 99