D-5:INSTALLATION OF BOOM CYLINDER FOOT PIN 1. Raise the boom cylinder with a crane, align with the chassis pin holes, then push in the pins. Boom cylinder assembly: 1150 kg 6 Inside of bushing: Anti-friction compound (LM-P) 2. Check the clearance (at the outside of the chassis) between the chassis and the end of the cylinder boss. Select a shim thickness to make the clearance 2 - 3 mm, and assemble the shims. Adjust both the left and right cylinders with shims. 3. Push the boom foot pin in fully, then install the (Outside of chassis) 4. Install the left and right sides in the same way. lock plate. * Assemble so that the boom cylinder bottom greasing * hole is at the bottom.
Combine the following shim thicknesses to make the adjustment shim. (%2lN-72-11230x 8) tl.O Parts sent individually 21 N-72-l 1230 Shim (tl .O) 8 Part No. Part Name Q’tv Shim 78