Komatsu — WARMING-UP OPERATION

MACHINE OPERATIONS AND CONTROLS OPERATION 3. Operate bucket control lever (3) and arm control lever (4) slowly to move the bucket cylinder and arm cylinder to the end of the stroke. 4. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 second intervals. REMARK If swing lock switch (5) is operated to the ON position, it is pos- sible to raise the oil temperature faster. NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. 5. After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condi- tion.

Engine oil level monitor (6): OUT Charge level monitor (7): OUT Fuel level monitor (8): OUT Engine water temperature monitor (9): OUT Engine oil pressure monitor (10): OUT Engine water temperature gauge (11): Inside green range Fuel gauge (12): Inside green range Engine pre-heating lamp(13): OUT Air cleaner clogging monitor (14): OUT Replacement monitor of engine oil (15): OUT 6. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 7. Use the working mode switch on monitor panel (16) to set to the desired working mode. 3-76