Komatsu — IN COLD AREAS (AUTOMATIC WARMING-UP OPERATION)

MACHINE OPERATIONS AND CONTROLS OPERATION 3. Operate bucket control lever (3) and arm control lever (4) slowly to move the bucket cylinder and arm cylinder to the end of their stroke. 4. Operate the bucket for 30 seconds and the arm for 30 seconds in turn fully for 5 minutes. REMARK Turn swing lock switch (5) ON (ACTUATED)and operate the lever to make the oil temperature rise more quickly. NOTICE When the work equipment is retracted,take care that it does not interfere with the machine body or ground. 5. After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condi- tion. Engine oil level monitor (6): OUT Charge level monitor (7):

OUT Fuel level monitor (8): OUT Engine water temperature monitor (9): OUT Engine oil pressure monitor (10): OUT Engine water temperature gauge (11): Inside green range Fuel gauge (12): Inside green range Engine pre-heating lamp(13): OUT Air cleaner clogging monitor (14): OUT Replacement monitor of engine oil (15): OUT 6. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 7. If air cleaner clogging monitor (14) is lighted up, clean or replace the element immediately. For details of the method of cleaning the element, see "CHECK, CLEAN AND REPLACE AIR CLEANER ELE- MENT (PAGE 4-21)". 3-78