When removing the battery cables, always remove the negative (-) cable first. When attaching battery cables, always attach the positive cable first. See Figure 3-44. Check Hydraulic Pressures Main Pump Pressure 1. Attach gauge to Port 1. See Figure 3-45. FIGURE 3-44 2869 Be certain that the battery is held securely in its compartment. Clean the battery terminals and the battery cable connectors. A solution of baking soda and water will neutralize acid on the battery surface, terminals, and cable connectors. Grease can be applied to the connectors to prevent corrosion. FIGURE 3-45 2846 2. The relief cartridge for the main pump must open at 195 +5 kg/cm 2 (2,845 +70 psi). 3.
Adjust the screw on the relief valve cartridge (1, Figure 3-46). Loosen the locknut and turn the screw clockwise to raise relief pressure. Turn the screw counterclockwise to lower the relief pressure. Check the level of the electrolyte in the battery. First clean the area around the battery caps. Open each cap. The fluid in each cell should be 10 – 15 mm (0.40 – 0.60") higher than the battery plates. Add water to bring the fluid to the proper level. 1. Relief Valve Cartridge Use a hydrometer to check the specific gravity of the electrolyte. At 6°C (43°F) a fully charged battery will give a reading of 1.290. The lower the reading, the lower the state of charge.
At 1.150 the battery is completely discharged. The battery must be fully charged to provide the proper cranking speed during start-up. A fully charged battery will also prevent electrolyte freeze-up during cold tempera- tures. Charge the battery until it is fully charged. If replacing a battery, it may be best to change both batteries at the same time. Using a new battery with an old battery can shorten the life of the new battery. FIGURE 3-46 2847 4. Tighten the locknut after the pressure has been adjusted. Steering Pump Pressure 1. Attach gauge to Port 2. See Figure 3-45. 2. Adjust the relief valve cartridge on the Steering Priority Valve. See Figure 3-47.
The cartridge must be adjusted to open at 185 +5 kg/cm 2 (2,630 +70 psi). 3-22 INSPECTION, MAINTENANCE AND ADJUSTMENT MEGA 300-III Shop Manual