Komatsu — 3.13.4 DIGGING METHOD

USING THE MACHINE AS AN EXCAVATOR 3.13.4 DIGGING METHOD q The geometry of the rotation fulcrum of boom, arm and bucket make it possible to dig even beyond the stabilizer line, which makes the ground give way. Do not dig beyond the boom fulcrum line, since the ground may collapse and cause the machine to overturn. 1 - At the beginning of work, keep the bucket at the correct penetration angle. 2 - Once the desired digging depth has been reached, position the bucket with its back parallel to bottom of the excavation and then start filling.

3 - During the collection phase, make bucket, boom and arm move simultaneously; combined movements facilitate the filling of the bucket and therefore increase productivity. 4 - The removal depth must be correct and suitable to the type of ground; excessive depth may lock the movements, overload the engine and the pump and slow down the digging operations. 5 - To dump on heaps, dump the bucket as soon as it gets near the dumping area; the inertia resulting from the movement will ensure the compaction of the material with no need to use the bucket for this purpose, which avoids impacts and vibrations that facilitate the wear of pins and bushings.

RWA00500 1 CORRECT The bucket works with its flat surface parallel to the ground. RWA00510 2 INCORRECT The bucket is thrusted downwards slowing down the digging work. RWA00520 3 INCORRECT The bucket is pushed upwards and therefore is not filled completely. RWA00530 CORRECT DIGGING METHOD (Sequence 1 - 2 - 3) 155 WARNING