C8.3 Industrial Sea Water Pump Section 6 - Maintenance Procedures at 300 Hours or 1 Year Page 6-13 NOTE: Do not use thread sealant on the zinc plugs. They must be grounded to the component to function properly. Install the zinc plugs in the aftercooler and heat exchanger. Refer to Procedure 008-059 (Zinc Anode). Install the sea water inlet and outlet connections. Torque Value: 5 N•m [ 44 in-lb ] Open the sea water valve on the vessel hull. Operate the engine and check for leaks. Sea Water Pump Preparatory Steps Shut off the sea water inlet valve on the vessel hull.