SERIES 60 SERVICE MANUAL 8. Secure the delivery pipe clamp to the cooler outlet. Torque the clamp nut to 12 N·m (106 lb·ft). See Figure 8-11. 1. Clamp 3. EGR Cooler 2. Venturi-Section 4. Air Lines Figure 8-11 Tube and Shell Bolted Flange EGR Cooler and Delivery Pipe 9. Attach the Delta P tube fittings to the venturi tube. See Figure 8-11. 10. Torque the tube fittings to 24-30 N·m (18-22 lb·ft). 11. If the TSBF EGR cooler studs have not been installed, use the following procedure: [a] Install three M8 studs into the threaded holes on the cooler. [b] Torque the studs to 28-32 N·m (21-24 lb·ft). 12. If the upper hot pipe and gasket have not been installed, use the following procedure:
[a] Install gasket and upper hot pipe onto the exhaust manifold center section studs. [b] Install two nuts on the studs to secure the upper hot pipe. [c] Torque the nuts to 22-26 N·m (16-19 lb·ft). 13. Loosely install the bellow to the EGR valve assembly and secure using the bellow clamps. 14. Slip the remaining bellow clamp over the flange of the upper hot pipe. 15. Install a new EGR cooler gasket. 16. Align the bellow with the upper hot pipe and while pressing against the upper hot pipe, lower the EGR valve assembly onto the TSBF EGR cooler studs. All information subject to change without notice. (Rev. 2005) 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION 8-13