Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

8.5 DDEC V VARIBLE PRESSURE OUTPUT DEVICE 8.5.2 Installation of Variable Pressure Output Device Installation steps are as follows: 1. Align VPOD assembly (4) with bracket to the engine block and secure with stud (3) and bolts (1). See Figure 8-40. Torque the M10 bolt and M10 stud to 58-73 N·m (43-54 lb·ft) and the M8 bolt to 30-38 N·m (22-28 lb·ft). 1. Bolt 3. Stud 2. Sensor Harness 4. VPOD Assembly Figure 8-40 VPOD and Related Parts 2. Connect the sensor harness (2) to the VPOD assembly (4). See Figure 8-40. 3. Connect air line (4) fittings to the VPOD assembly (1) and to the VNT actuator (5). See Figure 8-41. Torque the fittings to 12 N·m (106 lb·ft). (Rev.

2005) All information subject to change without notice. 8-46 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION