1.10 GEAR CASE COVER PRE-EXHAUST GAS RECIRCULATION (EGR) [f] Install the six bolts on the intake (left) side of the engine around the air compressor drive. Torque the bolts to 58-73 N·m (43-54 lb·ft), using the sequence. See Figure 1-167. Figure 1-167 Air Compressor Drive Torque Sequence [g] Install the SRS to the gear case; refer to section 2.30.3. [h] Install the two rear mounted bolts (pre - 1991 engines only) bolts on the exhaust (right) side of the engine. Torque the number 2 and 3 bolts to 58-73 N·m (43-54 lb·ft) torque. See Figure 1-168. Figure 1-168 Gear Case Cover Bolt Torque Sequence (Right Rear) (Rev. 2005) All information subject to change without notice.
1-188 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION