Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

1.21 PISTON AND CONNECTING ROD ASSEMBLY 30. Lubricate the lower bearing shell with clean engine oil. 31. Install the bearing cap. The number on the cap and rod should be on the same (oil cooler) side. 32. Torque the connecting rod bolts alternately to 160-185 N·m (118-137 lb·ft). 33. Check connecting rod side clearance by moving the rod from crank cheek to crank cheek. If there is no clearance, check for proper bearing cap installation. 34. Install the remaining piston and rod assemblies in the same manner. 35. Install a new head gasket. Refer to section 1.2.5. 36. Install the cylinder head. Refer to section 1.2.5. 37.

If previously removed, install the piston cooling nozzles at the base of the cylinder bores. Refer to section 1.1.4. 38. Install the lubricating oil pump inlet pipe and screen assembly, and the lubricating oil pump. Refer to section 3.2.6. 39. Install the oil pan. Refer to section 3.11.4. 40. Complete any other engine assembly as necessary. 41. After the engine has been completely assembled, refill the crankcase to the proper level on the dipstick. Refer to section 14.6.1. 42. Close the drain cocks and fill the engine with the recommended coolant. Refer to section 14.6.4, for refilling procedure and refer to section 5.4. NOTE: Coolant system maintenance is very important.

Bleed off all the air from the system and top off. (Rev. 2005) All information subject to change without notice. 1-344 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION