Detroit Diesel — Print Preview - C:\DOCUME~1\llakso01\LOCALS~1\Temp\.aptcache\S600507006\S600507

1.24 GEAR TRAIN AND ENGINE TIMING 1.24.3 Installation of Gear Train and Engine Timing After all of the gear lash measurements have been taken, assemble the engine components as follows: 1. Install the air conditioner compressor and brackets (if so equipped). Install the air conditioner drive belt. 2. Install the alternator and brackets. Refer to section 9.2.3. 3. Install the alternator drive belts. Refer to section 14.6.9. 4. Install the fan and fan hub assembly. Refer to section 4.6.6. 5. Adjust the alternator, fan and air conditioner compressor drive belts to the specifications. Refer to section 14.6.9. Torque the accessory mounting bolts to specifications. 6.

Install any other equipment such as hoses, brackets, lines or electrical looms that were removed to gain access to the engine gear case cover. 7. Install the engine oil pan. Refer to section 3.11.4. 8. Fill the engine crankcase. Refer to section 14.6.1. 9. Refer to section 12.7for verification of proper gear train and engine timing. (Rev. 2005) All information subject to change without notice. 1-398 6SE483 0507 Copyright © 2005 DETROIT DIESEL CORPORATION