14) Check that the end of each 14 mm clip aligns with the end of the taped part of the power tilt motor wire as shown. [2] 5 x 10 mm RIVET SCREW (2) [3] POWER TILT MOTOR WIRE 15) Tighten the two 5 x 10 mm rivet screws securely while pushing the end of the two 14 mm clips against the corresponding projection on the L. engine under cover. [1] PROJECTIONS [4] SPIRAL TUBE Take care not to let the alignment points described in the previous step come out of alignment. [5] TAPING [6] 14 mm CLIP (2) [5] TAPING [7] 14 mm CLIPS [2] 5 x 10 mm RIVET SCREW (2) 16) Insert the under cover grommet into the idle exhaust port as shown.
[1] IDLE EXHAUST PORT [2] UNDER COVER GROMMET 17) Insert the four projections on the under cover grommet into the holes in the engine under covers. 18) Aligning the holes in the under cover grommet with the holes in the engine under cover, set the six mud guard clips in the respective holes. Do not push in the head of the mud guard clips. [6] HOLE (4) [3] CLIP HEAD [5] PROJECTION (4) [4] MUD GUARD CLIP (6) 4-18