BF135A•BF150A 3. IAT sensor signal line short circuit check -1. Turn the ignition switch OFF and disconnect the ECM connector B. -2. Check for the continuity between the No. 2 (Red/ Yellow) terminal of the IAT sensor harness side 2P connector and the body ground. 5. IAT sensor check -1. Turn the ignition switch OFF and disconnect the IAT sensor 2P connector. -2. Measure the resistance between the No. 1 and the No. 2 terminals of the IAT sensor side 2P connector. IAT SENSOR HARNESS SIDE 2P CONNECTOR IAT SENSOR SIDE 2P CONNECTOR TA (RED/YELLOW) VIEWED FROM THE TERMINAL SIDE VIEWED FROM THE TERMINAL SIDE Is there the continuity?
YES – Repair short in the wire between the IAT sen- sor and the ECM. NO – Perform "4. IAT sensor ground line short cir- cuit check". RESISTANCE 4. IAT sensor ground line short circuit check -1. Turn the ignition switch OFF. -2. Check for the continuity between the No. 1 (Green/ Red) terminal of the IAT sensor harness side 2P con- nector and the body ground. IAT SENSOR HARNESS SIDE 2P CONNECTOR INTAKE AIR TEMPERATURE SG2 (GREEN/RED) Is there the resistance corresponding to the ambient temperature? YES – Substitute a known-good ECM and recheck. NO – Replace the IAT sensor and recheck. VIEWED FROM THE TERMINAL SIDE Is there the continuity? YES – Perform "5. IAT sensor check".
NO – Repair open in the wire between the IAT sen- sor and the engine ground. 5-79