honda — Programmed Fuel Injection

BF135A•BF150A 6. Signal line open circuit check -1. Turn the ignition switch OFF and disconnect the IAB control valve 2P connector. -2. Turn the ignition switch ON. Measure the voltage between the No.1 (Yellow/Black) terminal of the IAB control valve harness side 2P connector and the engine ground. IAB CONTROL VALVE HARNESS SIDE 2P CONNECTOR YELLOW/BLACK VIEWED FROM THE TERMINAL SIDE Is there the battery voltage? YES – Perform "7. IAB control valve check”. NO – Repair open in the wire between the ECM and the IAB control valve 7. IAB control valve check -1. Turn the ignition switch OFF. Disconnect the IAB con- trol valve 2P connector. -2.

Measure the resistance between the IAB control valve side 2P connector terminals. Is the resistance 37 – 44 ? YES – Substitute a known-good ECM and recheck. NO – Replace the IAB control valve. 5-110 Shutter Valve Diaphragm Inspection NOTICE Do not try to adjust the full close stop screw. Note that the shutter valve diaphragm must not be dis- assembled. If replacement is necessary, replace as an assembly of the intake manifold assembly. ) Check the following. • Check the shutter valve shaft for play and the stuck shaft. • Check the shutter valve for smooth movement from the full open to the full close positions.

• Check there is no clearance between the full close screw and the full close stopper when the shutter valve is in the full close position. • Move the shutter valve to the full open position and check that the shutter valve contacts the full open stopper. SHUTTER VALVE DIAPHRAGM FULL OPEN STOPPER STOP SCREW ) If there is any abnormality, clean the shutter valve diaphragm with a contact cleaner and recheck. If it is still abnormal, replace the intake manifold assembly.