honda — Programmed Fuel Injection

BF135A•BF150A 7) Install the pump harness assembly on the pump cover, and secure the pump harness assembly with the 4 mm screw. TORQUE: 2.1 N m (0.21 kgf m, 1.5 lbf ft) [1] 4 mm SCREW [2] 4 mm WASHER [4] PUMP HARNESS ASSEMBLY [3] PUMP COVER 8) Set the terminal holder on the pump cover and route each wire as shown. Align the bosses on the terminal holder with the holes in the pump cover. [1] TERMINAL HOLDER 9) Set the terminals in the positions shown. [2] TERMINALS [4] BLUE/ YELLOW WIRE [3] BLACK WIRE 10) Apply a thin coat of engine oil to the new O-ring and install them on the oil case. [1] BLACK WIRE TERMINAL 11) Set the seal ring at the discharge port of the pump. [5] O-RINGS Do not reuse.

12) Apply a thin coat of the engine oil to the new O-ring and set it at the discharge port of the pump. [2] BLUE/ YELLOW WIRE TERMINAL 13) Connect the pump harness assembly terminals to the pump terminals as shown. Connect the Blue/Yellow wire terminal to the positive (+) terminal of the pump and the Black wire terminal to the negative (–) terminal of the pump. [3] POSITIVE (+) TERMINAL [4] SEAL RING 5-123