BF135A•BF150A 3) Set the five 8 x 35 mm flange bolts, two 8 mm washers and the two 8 mm flange nuts. [1] 8 mm FLANGE NUT (2) 4) Tighten the 8 x 35 mm flange bolts and the 8 mm flange nuts in the numbered sequence in two or three steps to the specified torque. TORQUE: 26 N m (2.7 kgf m, 20 lbf ft) [2] 8 x 35 (2) and 8 mm WASHER (2) 8 x 35 (3) 5) Install the new throttle body gasket on the intake manifold. 8 x 60 (4) [1] THROTTLE BODY GASKET 6) Install the throttle body and tighten the 8 x 60 mm flange bolts in the numbered sequence in two or three steps securely. TORQUE: 22 N m (2.2 kgf m, 16 lbf ft) [2] THROTTLE BODY 7) Install the throttle rod.
Note the throttle rod installation direc- tion. Don't loosen the lock nut of the throttle rod [1] THROTTLE ROD 8) Connect the IAB control valve 2P connector. [1] IAB CONTROL VALVE 2P CONNECTOR 5-133