JCB — Flow and Pressure Testing

www.WorkshopManuals.co.uk Variable Flow Pumps Flow and Pressure Testing (Cont’d) Maximum Hydraulic Stall 3 Connect a 0 - 400 bar (0 - 6000 lbf/in 2 ) pressure gauge to pressure test connector B located on the pump pressure out line. With variable flow hydraulics the pump swashplate angle will increase or decrease according to pressure demand. However in situations of maximum hydraulic stall, i.e. ram full travel, the pressure in the circuit will achieve the setting of the pressure regulator spool. To check the setting: 4 Start the engine and run at 2200 rev/min.

5 Raise the loader arms to achieve full travel, hold the arms in this position and note the gauge reading, which should be as specified in Technical Data . Note : Machines with a load sense relief valve, disconnect and blank the load sense relief valve E at F . 6 If the pressure is higher than specified, the pressure compensator spool may be set incorrectly or the swashplate may not be moving. 1 Warm the hydraulic oil to working temperature, i.e. 50°C (122°F): If the pump pressure is lower than specified, the flow spool may be set incorrectly, or there may be a leak in the load sense line. a Set the engine speed to 2200 rev/min.

b Operate the loader shovel dump service to blow off the auxiliary relief valve. Do not make any adjustments at this stage. Complete the other checks detailed in this section. 2 Lower the backhoe bucket and loader shovel to rest on the ground; stop the engine; operate the control levers to vent residual hydraulic pressure. 7 Refer to R egulator Valve Adjustment . D C F B E S315770 9803/3280 Purchased from www.WorkshopManuals.co.uk Issue 1 Section E Hydraulics Section E 22 - 3 22 - 3 Service Procedures