Komatsu PC210-6K — 24.4 EVERY 100 HOURS SERVICE

“Mag 24. SERVICE PROCEDURE Boom-Arm coupling pin (1point) Arm cylinder rod end (1 point) Bucket cylinder foot pin (1 point) AN114700 8. 9. Arm-Link coupling pin (1 point) Arm-Bucket coupling pin (1 point) AN114710 10. Link coupling pin (2 points) 11. Bucket cylinder rod end (1 point) 12. Bucket-Link coupling pin (1 point) 12 he 74 1 10 24.4.2 CHECK OIL LEVEL IN SWING ADD OIL MACHINERY CASE, AWARNING The oil is at high temperature immediately after the machine has been operated. Wait for the oil to cool down before carrying out this check. 1. Remove dipstick @ and wipe the oil from the dipstick with a cloth. 2. Insert dipstick @ fully in the guide. 3.

When dipstick © is pulled out, if the oil level is between and L marks of the gauge, oil level is proper. 3-50 the H AN114720