5. If the measured pressure drop is low, check for vacuum leaks in the manifold, throttle, mixer, TMAP sensor and attached hoses. Figure 37. Magnehelic Gauge Connection Ignition Timing Adjustment With the MI-07 system, ignition-timing advance is controlled by the SECM see, chapter 4. Ignition system for the detail information. Idle Mixture Adjustment The CA100 mixer requires adjustment of the idle mixture screw to assure optimal emissions and performance. This adjustment accounts for minor part-to-part variations in the fuel system and assures stable performance of the engine at idle.
Once adjusted, the idle mixture screw is sealed with a tamper proof cap, after which it need not be adjusted for the life of the vehicle. Therefore, the only situations in which the idle mixture screw needs to be adjusted are when the engine is initially fitted with a fuel system at the factory and following the field replacement of the mixer. Under these situations, follow the procedures below for adjustment of the idle mixture screw. Factory Test Preparation: 1. Install the MI-07 fuel system, wiring harness and SECM-48 control module on the engine. 2. All coolant hoses should be attached, filled with coolant and bled to remove any air. 3. Attach LPG fuel lines. 4.
Attach wiring harness to battery power. 5. Attach exhaust system. CAUTION LP gas is highly flammable. To prevent personal injury, keep fire and flammable mate- rials away from the lift truck when work is done on the fuel system. Gas vapor may reduce oxygen available for breathing, cause headache, nausea, dizziness and unconsciousness and lead to injury or death. Always operate the forklift in a well ventilated area Liquid propane may cause freezing of tissue or frostbite. Avoid direct contact with skin or tis- sue; always wear appropriate safety protection including gloves and safety glasses when working with liquid propane.
AVV (Air Valve Vacuum) Testing Purpose of Test Check for excessive or inadequate pressure drop across CA100 mixer. AVV Test Hardware 1. Union Tee fitting, 1/4” (6.35mm) NPT with three 1/4” (6.35mm) NPT x 1/4” (6.35mm) hose barbs 2. Vacuum hose 3. 0-20” H2O differential pressure Magnehelic gauge AVV Test 1. Install Union Tee fitting in the hose between the FTVs and the AVV fitting. Connect this fitting to the low pressure port of the Magnehelic gauge (Figure 37). 2. Leave high pressure port of the Magnehelic gauge exposed to ambient pressure (Figure 37). 3. With the engine fully warmed up and running at idle (750 rpm) place the transmission in Neutral.
The AVV should be between 5” and 8” H2O of pressure vacuum. 4. If the measured pressure drop is excessively high, check for sticking or binding of the diaphragm air valve assembly inside the mixer. Replace mixer if necessary. G643(E) Service Manual Chapter 6. LPG FUEL DELIVERY SYSTEM 201