Doosan DL06 — Doosan DL06 User Manual

(1) First stage : Coat the bolts with engine oil. (2) Second stage : Tighten 1 ~ 2 threads with hands. (3) Third stage : Tighten at about 5 kg.m with a wrench. (5) Fifth stage : Tighten at rotating angle method 90 ° with a wrench. (4) Fourth stage : Tighten at rotating angle method 90 ° with a wrench. (6) Sixth stage : Finally, tighten at rotating angle method 90 ° with a torque wrench. z All bolts are tightened simultaneously by above steps Coat the push rod with engine oil and insert it into the push rod hole. 3.3.19. Injector z The injector should be assembled Injector correctly by the following order.

Injector bush z Put the O-ring into the injector and coat the circumference face of it Fuel high pressure connecter with engine oil. Caliper z The sealing set to injector hole of cylinder head, then the injector Fixing nut insert. (The side groove face of injector set to the fuel high pressure connector.) z The injector set to injector fixing bracket with the fixing bolt, then assemble temporarily it. DL06 Diesel Engine Disassembly and Reassembly of Major Components 109 Specification M13×1.5×140 Torque 1st Tightening : 5 kg.m 2nd Tightening : 90° 3rd Tightening : 90° Final tightening : 90° Temporarily torque Injector fixing bracket Fuel high pressure connector fixing nut 0.3 kg.m 0.25 kg.m