Komatsu — WHEN REQUIRED

. MAINTENANCE SERVICE PROCEDURE ADJUSTING SHIMS, ADJUSTING TENSION AT WORK EQUIPMENT LINKS NEED FOR ADJUSTING WORK EQUIPMENT LINKS CAUTION Power tiltdozer Powertilt, Power pitch dozer Semi U-dozer Angledozer (There is no portion B on the angledozer) 4 - 36 When assembling the work equipmen t, carry out adjustment as Check the play of the links periodicall y and carry ou t adjustmen When disassembling the machine for transportation , be careful not If th e clearances at eac h bal l joint of the work equipment and t he tension o f the center brace are not a djusted properly, it will lead to problems.

It is necessary t o carry out adjustment prope rly regardless of whether the machine is new and regard less of the number of y ears tha t it has been used.

Problems that occur when adjustment is not correct Location Condition Problems that appear Ball joint portion (portion A in diagram below) Excessive play Work equipment play becomes excessive and performance deteriorates Sand or dust enters through gap and causes wear Impact load at joints increases and durability is reduced No play Ball cannot rotate, excessive bending stress is generated, and cracks or damage occur Center brace (portion B in diagram below) Insufficient tension Work equipment play becomes excessive and performance deteriorates Sand or dust enters bushing at blade connection and causes wear Shaking to side increases, lift cylinder hose contacts bodywork and frame contacts track Excessive tension Excessive bending tension is generated, and cracks or damage occur