MAINTENANCE SECTION 5 Page 25 5.8. COOLING SYSTEM Installation When installing the cap, gasket and contacting surfaces must be clean. Turn the cap to the right or clockwise until snug. 5.8.4.2. Cleaning the Radiator Core Every 50 hours of operation remove dirt from the radiator core. Refer to 5.5.2 for radiator core cleaning procedure. Air conditioner cooler core must also be cleaned (if installed). For machines equipped with QSK-19C engine clean also fuel cooler. 5.8.5. CHECKING COOLANT LEVEL Fig. 5.9. Radiator Sight Gauge Check the coolant level daily before starting the engine.
For checking the coolant level place the machine on the level ground and lower the mounted equipment on the ground. Coolant level must be seen in the radiator sight gauge. After replenishing coolant in the radiator check and correct concentration of DCA4. IMPORTANT: Never add coolant when engine is hot. This may result in damage to the engine. Allow the engine to cool down below 50°C prior to replenishing coolant in the radiator. DRESSTA TD-40C