DRESSTA Co. Ltd. TD-40C98/1E — 5.15. MOUNTED EQUIPMENT

MAINTENANCE SECTION 5 Page 47 5.15. MOUNTED EQUIPMENT Using the removal shims (Fig. 38) determine the maximum amount of shims which will fit the gap between the cap (5) and lever (3) gap. Check if the gap is equal on all sides between the cap (5) and lever (3). When the correct shim pack for the gap between the strut cap (5) and lever (3) is determined add one shim to provide clearance. Each shim is 0.75 mm. Prior to final assembly clean all shims (2) and mating surfaces of all foreign material, dirt and paint. Clean the threaded holes in the lever (3) and cap screw (4) threads and coat with LOCTITE "T" primer.

Insert the shims (2) over the strut ball and install the strut with shims to the lever (3) Apply LOCTITE 262-thread locker to the cap screws (4) and torque to 1500 Nm. Hoist the strut (1) into position in the strut bracket on the push arm. While maintaining the stress relieve parallelism to the back of the blade check the misalignment between the bracket bore and strut eye bore. To lengthen or shorten the strut for pin bore alignment, loosen the clamp bolts securing the strut eye. Adjust the bore in the strut eye to align with the bore in the push arm bracket. Insert the strut pin and lock.

Repeat this procedure for the opposite side while continuing to maintain stress reliever lever (3) parallelism with the back off the blade. Fig. 5.39. Diagonal Strut Adjustment 1. Diagonal Strut 2. Shims 3. Stress Reliever Lever 4. Cap Screws 5. Strut Cap DRESSTA TD-40C