DRESSTA Co. Ltd. TD-40C98/1E — 4.18. OPERATING MOUNTED EQUIPMENT

SECTION 4 OPERATING Page 30 OPERATING MOUNTED EQUIPMENT Fig. 4.27. Ripper Control Lever 1. Blade Control Lever 2. Ripper Control Lever I - Ripper Pitch Forward II - Ripper Pitch Aft III - Ripper Raise IV - Ripper lower V - Hold 1. Ripper Pitch (forward or aft) To change angle of ripper tooth move the ripper control lever: a) Ripper point forward – move the lever to “I” position. b) Ripper point aft – move the lever to “II” position. The control lever will return automatically to HOLD position when released (from “I” to “V” position) 2. Ripper Raise To raise the ripper to required height move the lever in “III” position.

The control lever will return automatically to HOLD position “V” when released. 3. Ripper Lower To lower the ripper moves the lever in “IV” position. The control lever will return automatically to HOLD position “V” when released. NOTE: Holding the control lever in any position except HOLD for an extended period of time will produce excessive heat in the hydraulic system which may affect equipment performance. 4.18.8. HYDRAULIC PIN PULLER The pin puller control lever will return automatically to hold when released. Push the lever to the right to remove the shaft pin, pull to the left to install the shaft pin.

Raise or pitch ripper shank during those operations to facilitate pin movement in hole. TD-40C DRESSTA