SECTION 4 OPERATING Page 36 OPERATING TECHNIQUES Penetration on hard, frozen or rocky ground can be made easier by tilting the blade. This will add weight and power to the lower cutting edge. When the ground is frozen and the area must be ripped before it can be worked, rip a relatively small section and work it to grade before enlarging the cut. This will require ripping each section only once, not every morning after the ground has refrozen. Snow can act as an insulating blanket and reduce or eliminate the need for a ripper. Therefore, remove snow only from the area to be worked each day; leave the rest to insulate the ground. 4.19.2.
TRANSPORTING, PILING OR LOADING The transporting of material with a bulldozer is not always a most economical method. Natural ridges, a window formed by side blade spillage on earlier passes or side-by-side, dozing will improve the productivity (Fig 4.39). Where the quantity of material or distance involved becomes excessive, a loader, scraper or truck should be considered. Fig. 4.39. Side-by-Side Dozing A usual method of piling is shown in Fig. 4.40. When the piling reaches stages “D” or “E” the operator may elect to continue one of the other depending on height or area desired. When the tractor is used as a pusher, aiding scraper loading (Fig.
4.41), the tractor power must be carefully controlled. Excessive “push” effort can cause the scraper unit to “jackknife”, with resulting injury or damage. On turns, be sure the blade of the pusher tractor does not come in contact with the rear wheels of the scraper. Fig. 4.40. A Usual Method of Piling TD-40C DRESSTA