OPERATING SECTION 4 Page 37 OPERATING TECHNIQUES Fig. 4.41. Aiding Scraper Loading The bulldozer can be used directly as a loader if the method shown in Fig. 4.42 is used. Fig. 4.42. Loading Directly 4.19.3. BREAKING PILES AND SPREADING Two methods of breaking down a pile are shown in Fig. 4.43. When spreading is to be in several directions or if the pile is large or hard, Method 1 is usually desired. When using Method 1, cut into the side of the pile from different angles. When Method 2 is used, and access to the top of the pile is difficult, a slot may be started as shown below. Loosen material at the base and form a dirt “ramp” to provide a decreased angle of approach and cut.
Method 1 DRESSTA TD-40C