Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 02 ENGINE Subsection 11 (CYLINDER BLOCK) NOTICE Failure to strictly follow this proce- dure may cause screw to loosen and lead to engine damage. Knowing that the screws have been stretched from the previous installation, it is very important to use new screws at as- sembly. 1. Arrow toward exhaust side 2. Correctly install bearings and carefully clean split surface on both sides (cracked area). 1. Angle torque wrench PISTON RINGS Piston Ring Removal Remove piston as described above. Remove rings. Piston Ring Inspection Ring/Piston Groove Clearance Using a feeler gauge measure each ring/piston groove clearance.

If the clearance is too large, the piston and the piston rings should be replaced. 1. Half bearing of connecting rod big end 2. Split surface of the connecting rod 3. Protrusion of bearing in line with connecting rod groove 3. Torque NEW connecting rod screws no. 11 as per following procedure: 3.1 Install screws and torque to 45 N•m (33 lbf•ft). Do not apply any threadlocker product. 3.2 Finish tightening the screws with an ad- ditional 90° turn using an angle torque wrench.

158 smr2009-026 RING/PISTON GROOVE CLEARANCE NEW RECTANGULAR 0.025 mm - 0.070 mm (.001 in - .0028 in) TAPER-FACE 0.015 mm - 0.060 mm (.0006 in - .0024 in) OIL SCRAPER RING 0.020 mm - 0.055 mm (.0008 in - .0022 in) SERVICE LIMIT ALL 0.15 mm (.006 in)