Bombardier Recreational Products Inc. (BRP) Sea-Doo RXT iS255 GTX LIMITED — Print Preview - C:\DOCUME~1\coderma\LOCALS~1\Temp\.aptcache\smr2009Piranhaen6/tfa03092

Section 04 FUEL SYSTEM Subsection 01 (INTELLIGENT THROTTLE CONTROL (iTC)) 12. Reconnect gauge connector. 13. Properly insert cruise switch wiring in slot in switch support before installing MODE/SET and UP/DOWN arrow switches. smr2009-036-003_a GAUGE CONNECTOR PIN-OUT 3. Attach a string approximately 1.2 m (4 ft) to the end of the wires which will be used for draw- ing the new switch wires through the harness protective sheath. 4. Remove steering cover. Refer to STEERING AND O.T.A.S. subsection. 5. Remove the MODE/SET and UP/DOWN arrow switches from its support. NOTE: It is not necessary to disconnect switches. smr2009-036-014_a SOME PARTS REMOVED FOR CLARITY 1. Cruise switch 2.

Wiring in slot 3. MODE/SET and UP/DOWN arrow switch connector 14. Complete installation in reverse order of re- moval. smr2009-036-013_b 1. MODE/SET and UP/DOWN arrow switches 2. Cruise switch 6. Remove the cruise switch by lifting it off its sup- port. 7. Cut the locking ties from the harness sheath as necessary. 8. Carefully pull the wires out of the harness. Ensure the string draws through the harness sheath. 9. Tie the string to the new cruise switch wire ends and pull the new wires through the har- ness. 10. Install new switch terminals in the gauge con- nector. 11. Apply a small amount of DIELECTRIC GREASE (P/N 293 550 004) on switch terminals. 218 smr2009-050